Millside at Heritage Park, Canton, MA
-
Location: Neponset St, Canton, MA
-
Building Description: 60 units
-
Open Date: July 2021
Currently under construction, this 60 unit, 55-and-older apartment complex is located in the heart of the redevelopment of the former Paul Revere Copper Factory located directly off of Neponset St that will eventually have 272 units of residential living along with commercial amenities. The project is located in close proximity to walking trails, public parks and a riverwalk adjacent to the Neponset River. Canton Junction and Canton Center are located within easy walking distance providing commuter access to Boston and Providence. Residents will have access to a clubhouse and pool and the restored Historic Paul Revere Foundry building will provide dining excellence.
Emblem 120
Woburn, MA
Client
Toll Brothers
Architect
CUBE 3
At a glance
-
6-story, wrapped & podium construction
-
289 units
-
470,115 SF
-
Amenities courtyard
NYCDOITT/FDNY/NYPD
Bronx, NY
Access Control
PDC IDenticard-PremiSys/Rack Armor
Video Surveillance
MiraSys
At a glance
-
Data Center Racks Secured with PremiSys Rack Armor Pro
-
Pinhole Cameras- Axis Communications
-
Power Supplies -Life safety Power
Avalon Bay Properties
Multiple Locations MA
-
Prudential Towers (3 Towers)
-
Assembly Row
Access Control
Latch Systems
LifeSafety Power
Wiring
Paige Datacom
The Foundry-Promenaude & Sharp
Providence RI
Access Control
Latch Systems
LifeSafety Power
Wiring
Paige Datacom
Wrentham Town Hall
Wrentham MA
Access Control
PDC IDenticard
LifeSafety Power
Wiring
Paige Datacom